Most of the mounting points for the stages have been screwed in at this point in strongback construction.
This entry was posted on Monday, April 23rd, 2012 at 9:00 am and is filed under Hull, Pictures, Work.
You can follow any comments to this entry through the RSS 2.0 feed.
You can leave a comment, or trackback.